Update on the building of the Fuso Santek expedition vehicle in Riverside, California, USA.
The aluminum sheets from which to make the roof have arrived.
The 6 gallons (22 liters) waterheater has been installed.
The shower floor in position.
Next to the shower a floor is made.
Inside the isolation material is applied on the walls.
While in the meantime Manuel finishes the installation of the steps.
The steps ready.
Discussion how to proceed.
Air tank ready to be installed.
The pump for the airtank is installed in the rear cargo compartment.
Another opening for a window made.
Inside the inner walls are glued to the frame and the isolationmaterial.
All the inner walls in place after which the window openings need to be cut out.
Openings are made for the electricity sockets.
Sockets are mounted.
The lining of the outside body.
The back up LED-lights.
The round corners are put in place.